companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

MEZZANINE

DRUMMONDVILLE-Canada

Company Name:
Corporate Name:
MEZZANINE
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 330 Rue Lindsay,DRUMMONDVILLE,QC,Canada 
ZIP Code:
Postal Code:
J2B1G5 
Telephone Number: 8194725772 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
581303 
USA SIC Description:
Cocktail Lounges 
Number of Employees:
10 to 19 
Sales Amount:
$500,000 to $1 million 
Credit History:
Credit Report:
Excellent 
Contact Person:
Marcellin Leveillee 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
MICROAGE
MICHEL POUDRETTE FERBLANTIER
MGM GROUPE DE SECURITE INC
Next company profile:
MEUNIER, SEBASTIEN
MEUNIER SEBASTIEN AVOCAT
MEUBLES DOUBLE ACCENT INC










Company News:
  • Mezzanine - Accessible Means of Egress vs. Accessible Route
    Feb 25, 2014 #3 If the total (aggregate) square footage between the mezzanine and the floor below is less than 3,000 square feet, than an accessible route is not required If an accessible route is not required, then an accessible means of egress would not be required This can be found in the commentary to the IBC in Section 1007
  • Mezzanine egress - The Building Code Forum
    For whatever reason the code says the mezzanine shall have two means of egress So I say if you have two of each of the components in the definition of a means of egress, exit access, exit, and exit discharge, then you are good If the stairway is exit access and converges then I say the mezzanine does not have two means of egress
  • Mezzanine - The Building Code Forum
    A mezzanine having two or more exits or access to exits is not required to be open to the room in which the mezzanine is located 3 Mezzanines or portions thereof are not required to be open to the room in which the mezzanines are located, provided that the aggregate floor area of the enclosed space is not greater than 10 percent of the
  • Reason for 2015 IBC 505. 2. 1 Mezzanine Area rule?
    The clear height above and below the mezzanine floor construction shall be not less than 7 feet 505 2 1 Area limitation The aggregate area of a mezzanine or mezzanines within a room shall be not greater than one-third of the floor area of that room or space in which they are located
  • Mezzanine vs. 2nd floor - The Building Code Forum
    A mezzanine shall be open and unobstructed to the room in which such mezzanine is located except for walls not more than 42 inches (1067 mm) in height, columns and posts Exceptions: 2 A mezzanine having two or more exits or access to exits is not required to be open to the room in which the mezzanine is located 5
  • Mezzanine: 1 3 of room - The Building Code Forum
    Oct 2, 2018 #3 2015 IBC 505 2 1 has exceptions that allow for larger mezzanines than that: 505 2 1 Area limitation The aggregate area of a mezzanine or mezzanines within a room shall be not greater than one-third of the floor area of that room or space in which they are located The enclosed portion of a room shall not be included in a
  • Is a Mezzanine considered a floor? - The Building Code Forum
    A mezzanine or mezzanines in compliance with Section 505 2 shall be considered a portion of the story below Such mezzanines shall not contribute to either the building area or number of stories as regulated by Section 503 1 The area of the mezzanine shall be included in determining the fire area
  • mezzanine - The Building Code Forum
    In one large room was a lazer tag room Room is about 2000 sq feet The lazer tag area also was designed with a mezzanine area platform of about 750-900 sq ft with two ramps on each end 7'-8' height under mezzanine The mezzanine platform was constructed out of standard 2x4 studs and 2x8 joists with 3 4" frtw flooring material
  • Stairs - # required? Enclosure required? - The Building Code Forum
    If a mezzanine, one exit is permitted per Table 1015 1 as referenced in the exception to 505 3 The travel distance is either 250 feet or 400 feet depending on the occupancy (you don't indicate which of the Group S occupancies is on the upper level)
  • stair requirements to mezzanine level - The Building Code Forum
    No area separation required The ceiling is 24'0 so the client wants to do about 800 sf of office at the front of the space and a mezzanine level of more office space- another 800 sf above the 1st floor office Occupant load about 25 Access to the the warehouse behind will be done at from the 1st floor office




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer