companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

IBC WEB DESIGN - TRAVIS BEST

JERSEY MILLS-USA

Company Name:
Corporate Name:
IBC WEB DESIGN - TRAVIS BEST
Company Title: Grieb Architects 
Company Description: grieb architects is a comprehensive architectural planning and design firm specializing in commercial, educational and rehabilitation projects 
Keywords to Search: grieb architects 
Company Address: 664 Geiler Hollow Rd,JERSEY MILLS,PA,USA 
ZIP Code:
Postal Code:
17739 
Telephone Number: 5707489253 (+1-570-748-9253) 
Fax Number: 5707487909 (+1-570-748-7909) 
Website:
www. grieb architects. com 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
737415 
USA SIC Description:
Internet Service 
Number of Employees:
 
Sales Amount:
 
Credit History:
Credit Report:
 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
UNITED WAY OF ALLEGHENY COUNTY
MARK BEATTY
JOHN HERREID
Next company profile:
SALMO-TRUTTA ENTERPRISES; INC
NEVILLE
SWEITZERS PERFORMANCE










Company News:
  • Fire Separation Distance Between New and Existing Building with Windows
    Hi there! Recent grad, intern architect and second time poster I'm working on a project in Cedar Rapids, Iowa and am using the 2021 IBC and commentary To say I'm a bit overwhelmed is an understatement I have a conundrum (at least for me, hopefully not for you all) I've attached a picture to
  • Changes in the 2024 International Building Code (IBC)
    The 2024 IBC® contains many important changes such as: Duties and powers of the building official: an overall reformat of Section 104 regulating duties of the building official, the approach for reviewing for code compliance has been significantly updated to reflect the current manner that alternate materials, designs and methods are evaluated
  • Two-way communications at elevator | The Building Code Forum
    IBC section 1009 is Accessible Means of Egress, so if an elevator isn't part of a required accessible means of egress nothing in 1009 would apply That said, I'm an old man and I can't recall ever being in an elevator that didn't have two-way communication (Whether it worked or not is an open question )
  • Occupant Load for an Indoor Sports Facility
    I am trying to determine the occupant load from table 1004 1 1 for an indoor sports facility (Using the 2009 IBC) The facility will be a 180' x 300' (54,000 s f ) clear span metal building used for indoor sports activities such as a soccer field What "Floor Area Per Occupant" should I use
  • Area Calculation Clarification - The Building Code Forum
    Party walls are "fire walls" by IBC description (See Section 706 1 1, 2009 IBC) Therefore, buildings area is measured to the face of the wall on the side that is being measured; thus, the party fire wall is not included in the building area (see the "building area" definition)
  • When does a stair require a handrail? | The Building Code Forum
    IBC 2018 1011 11 requires handrails on "Flights of Stairways", both flight and stairways are defined in chapter 2 A single change in elevation is not a flight nor a stairway as defined by the model IBC, thus single changes in elevation do not require handrails, the IBC even has an exception that says so, not sure why, but it does
  • Direct and Unobstructed Access to a Public Way
    In accordance with IBC 2015 Section 1028 5 and NFPA 101 Section 7 7 1, exits shall discharge at a public way or exit discharge shall provide "direct and unobstructed access to a public way" as stated by the IBC Can someone please clarify what they consider to be direct and unobstructed access
  • 1006. 2. 1 Egress based on occupant load and common path of egress travel . . .
    2021 IBC Section 1006 2 1 requires that two exit or exit access doorways shall be provided to any space if the design occupant load or the common path of egress travel exceeds the values outlined in Table 1006 2 1 The classrooms shown in the plan below meet the common egress travel requirements and do not exceed the specified occupant load
  • Occupancy for small conference break rooms - The Building Code Forum
    Using 2009 IBC, I believe the correct loading would be to use an assembly loading from Table 1004 1 1 for a break room or conference room In your scenario, what is 750 sq ft - the entire tenant space or the conference room alone? Assume this type of scenario: A conference room (for employees only) in a multi-floor office building
  • Define: Monumental Stair - The Building Code Forum
    See IBC 1009 10 and IBC 1012 8 for details Reactions: ADAguy Gene Boecker REGISTERED Joined Oct 19, 2009




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer