|
- Wildfire Mitigation Plan Related Documents | SCE
Review SCE’s current wildfire mitigation plan and related documents to understand how we reduce fire risk and protect your community year-round
- Electrical Service Requirements (ESR) | SCE Manuals | Regulatory . . .
The Electrical Service Requirements (ESR) Manual guide is tailored for electrical contractors, engineers, architects, and manufacturers It provides clear and practical instructions for all aspects of electrical service connections, including the installation of electrical service wiring and equipment
- NET ENERGY METERING Interconnection Handbook
To deliver incidental power to the grid, a customer’s generating system must be located on the customer’s premises and be interconnected to SCE’s electrical system, i e , permanently connected to allow “parallel operation” with the utility grid
- Net Energy Metering Interconnection Handbook - SCE
NEM applicants are now required to use SCE’s NEM online interconnection SCE’s NEM Online Interconnection Application System to submit an Interconnection Request (IR) Please access the online application system to view the status of an IR or submit additional documentation
- Company’s 2023-2025 Wildfire Mitigation - SCE
Section 6 3 2 and clarified why only one diagram is presented 6 5 Enterprise System for Risk Assessment 172 Overview not provided Please include the overview required in this section SCE added an overview to Section 6 5 8 1 2 4 Transmission Pole Tower Replacements and Reinforcements 270 Section lacks detail and references other
- Underground Structures (UGS) | SCE Manuals | Regulatory Information . . .
The UGS Manual provides guidance and standards pertaining to installing and working with underground structures for electrical facilities
- Edison Intl Template - SCE
Roughly 1 in 3 Southern California households (1 3M) are eligible to receive Income Qualified Assistance SCE provided over $664 Million in CARE and FERA bill discounts in 2022 (avg discount per household is $45 12 per month) CARE and FERA are entry level programs which can provide immediate assistance
- Energization Process Steps and Project Timing
SCE’s timeline will be based on activities in steps 2, 4, 6-8 that are within SCE's control Customer Intake: Customer submits energization request, and SCE educates the customer on application requirements
|
|
|