companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories














  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the direction and magnitude of the velocity at all points are identical (b) the velocity of successive fluid pai-ticles, at any point, is the same at suc¬cessive periods of time (c) the magnitude and direction of the velocity do not change from point to point
  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the flow is steady (b) the flow is streamline (c) size and shape of the cross section in a particular length remain constant (d) size and cross section change uniform¬ly along length (e) flow occurs at constant fate The correct Answer Is (c) size and
  • Stone - Stone masonry made from uniform sized and coursed . . . - Civil4M
    Stone masonry made from uniform sized and coursed stones joined with mortar and fine finished is called - (a) ashlar masonry (b) simple stone masonry (c) rubble masonry (d) none of the above The correct Answer Is (a) ashlar masonry
  • Deflection - A uniform rise in temperature on a portal frame . . . - Civil4M
    A uniform rise in temperature on a portal frame will cause - (a) No sway (b) May cause sway depending on the temperature (c) May cause sway depending on the relative properties of the members (d) None of the above The correct Answer Is (c) May cause sway depending on the relative
  • A one dimensional flow is one which - Civil4M
    A one dimensional flow is one which (a) is uniform flow (b) is steady uniform flow (c) takes place in straight lines (d) involves zero transverse component of flow (e) takes place in one dimension The correct Answer Is (d) involves zero transverse component of flow
  • Why we do PCC before footings? - Civil4M
    In any construction project, after excavation, PCC is done before footing Why we do PCC at the base of footing, PCC have lower strength than concrete and it is placed at base?
  • Uniform pressure Temperature predominant metamorphism is
    Uniform pressure Temperature predominant metamorphism is A Dynamothermal metamorphism B Thermal metamorphism C Plutonic metamorphism D None of the
  • Checklist for all kinds of tiling works including grouting . . . - Civil4M
    Uniform compaction with straight edge flat shovel has been ensured Floor Tiling Work Pre Execution Checks: Are all the required tools available at site? The surface on which tiles to be laid made moist, free from dust and other contaminations The plan setting out for tiling done All the tiles are of required dimensions




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer