companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories














  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the direction and magnitude of the velocity at all points are identical (b) the velocity of successive fluid pai-ticles, at any point, is the same at suc¬cessive periods of time (c) the magnitude and direction of the velocity do not change from point to point
  • A one dimensional flow is one which - Civil4M
    A one dimensional flow is one which (a) is uniform flow (b) is steady uniform flow (c) takes place in straight lines (d) involves zero transverse component of flow (e) takes place in one dimension The correct Answer Is (d) involves zero transverse component of flow
  • Work Procedure Specifications for Internal and External . . . - Civil4M
    Wetting shall be uniform To avoid cracks at the junction of concrete with masonry work, the plaster shall be reinforced at such junctions by fixing standard wire mesh (6 x 6 x 6 6) as directed by the Engineer-In-Charge The wire mesh shall overlap concrete and masonry surface by at least 150mm
  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the flow is steady (b) the flow is streamline (c) size and shape of the cross section in a particular length remain constant (d) size and cross section change uniform¬ly along length (e) flow occurs at constant fate The correct Answer Is (c) size and
  • In Resource Leveling - Civil4M
    In Resource Leveling - (a) Total duration Of Project is Reduced (b) Total duration Of Project is Increased (c) Uniform Demand of Resources is achieved (d) Cost of Project is Controlled The correct Answer Is (c) Uniform Demand of Resources is achieved
  • Normal depth in open channel flow is the depth of flow corresponding to
    Normal depth in open channel flow is the depth of flow corresponding to (a) steady flow (b) unsteady flow (c) laminar flow (d) uniform flow (e) critical flow The correct Answer Is (d) uniform flow
  • Why we do PCC before footings? - Civil4M
    In any construction project, after excavation, PCC is done before footing Why we do PCC at the base of footing, PCC have lower strength than concrete and it is placed at base?
  • Capital recovery factor considers - | Civil4M
    Capital recovery factor considers - (a) developing a predetermined sum at a future data at a uniform rate (b) consuming a predetermined sum till a future