|
- Uniform flow occurs when | Civil4M
Uniform flow occurs when (a) the direction and magnitude of the velocity at all points are identical (b) the velocity of successive fluid pai-ticles, at any point, is the same at suc¬cessive periods of time (c) the magnitude and direction of the velocity do not change from point to point
- Uniform flow occurs when | Civil4M
Uniform flow occurs when (a) the flow is steady (b) the flow is streamline (c) size and shape of the cross section in a particular length remain constant (d) size and cross section change uniform¬ly along length (e) flow occurs at constant fate The correct Answer Is (c) size and
- Stone - Stone masonry made from uniform sized and coursed . . . - Civil4M
Stone masonry made from uniform sized and coursed stones joined with mortar and fine finished is called - (a) ashlar masonry (b) simple stone masonry (c) rubble masonry (d) none of the above The correct Answer Is (a) ashlar masonry
- Deflection - A uniform rise in temperature on a portal frame . . . - Civil4M
A uniform rise in temperature on a portal frame will cause - (a) No sway (b) May cause sway depending on the temperature (c) May cause sway depending on the relative properties of the members (d) None of the above The correct Answer Is (c) May cause sway depending on the relative
- A one dimensional flow is one which - Civil4M
A one dimensional flow is one which (a) is uniform flow (b) is steady uniform flow (c) takes place in straight lines (d) involves zero transverse component of flow (e) takes place in one dimension The correct Answer Is (d) involves zero transverse component of flow
- Uniform pressure Temperature predominant metamorphism is
Uniform pressure Temperature predominant metamorphism is A Dynamothermal metamorphism B Thermal metamorphism C Plutonic metamorphism D None of the
- Why we do PCC before footings? - Civil4M
In any construction project, after excavation, PCC is done before footing Why we do PCC at the base of footing, PCC have lower strength than concrete and it is placed at base?
- Checklist for Internal Painting Works - Civil4M
Checklist for Internal Painting Works Checklist for internal painting works consist of following points; Material Approved Make Type Shade Surface Prepared Preparation of Paints primer Hardware installed are covered Application of Primer Application of Putty Scrapping and Application of
|
|
|