- Solved: Can I contact Openreach directly - BT Community
If it’s day 5 , then 2 of those days are Saturday and Sunday ( so effectively don’t count ) so if the repair isn’t made today compensation is due , Openreach don’t like paying this , so if it’s possible to repair then they won’t be simply ignoring the problem, and making efforts to fix the issue, however some fixes take time , if a road closure, or traffic management were required
- Solved: New Fibre install - pre install survey? - BT Community
No there is no pre-installation option , but if you already have an overhead cable , Openreach FTTP service usually would follow the existing route, the same ( existing ) fixing bracket on your wall also used for the new optical cable , unless you have a chimney bracket or the existing fitting is now inaccessible … extra holes are unavoidable as Openreach use a ladder fixing system Tetra
- Openreach major service outage - BT Community
There's been a major service outage in my area for over 3 weeks now There's a temporary fix in place - Broadband goes off every night and an engineer comes out between 8am and 9am every morning and resets something in the cabinet (takes 5-10 minutes) Last weekend it went off on Saturday afternoon
- Openreach Full Fibre Installation - BT Community
Openreach can install a new full fibre cable in but it will cost £6200 (of which BT will pay £3400) leaving us to pay £2800 This seems unreasonably high and Openreach on their website seem to suggest they do offer a free installation? We also were initially told by an openreach engineer that they could do an overhead connection
- openreach master socket port shape is wrong - BT Community
Hello, I bought a broadband package 5 days ago and just received my Smart Hub 2 I originally scheduled for someone to set it up for me but I received an email saying it wasn't needed -- because there is an openreach master socket in my new flat, I assume Unfortunately, it seems like an older model
- BT Openreach needs permission but wont say who from. . .
Openreach would put in a Permit for an Excavation on the Public Highway with the relevant Local Authority They don’t need a PTD from them, after the Permit is requested they’ll be given a Permit Number and are usually given a 3 day window to have the hole dug and reinstated, although if laying multiple metres of Duct Track that will be
- How to Check Full Fibre Rollout? - BT Community
The Openreach roll-out page has the following information in the first paragraph We’re committed to building the best digital future for the UK, so we’ve announced an ambitious plan to deliver Ultrafast full fibre Broadband to 25 million homes and businesses by December 2026, if the right investment conditions are in place
- Where to email a permission to work form to openreach - BT Community
Quick update - I spoke to Openreach on facebook and they told me that its an old email so they've passed it on from there, hopefully Just incase anyone else gets stuck in an endless loop like i did, that's a kind of solution
|
|
|