|
- psearch. kitsapgov. com
We would like to show you a description here but the site won’t allow us
- Title 17 ZONING
“Development rights” means the residential building rights permitted to a lot or parcel within a sending area, as defined in this chap-ter, based on the gross density, established pur-suant to the Kitsap County zoning map and this title, and measured in base dwelling units per developable acre
- Chapter 12. 10 PERMITS
The procedures for requesting and granting extensions or renewals to permits and procedures for the disposition of inactive or expired permits shall be detailed in the Kitsap manual
- Title 17 ZONING - dcd. kitsapgov. com
17 428 Master Planning Requirements for the South Kitsap UGA ULID #6 Sub-Area 17 430 Transfer of Development Rights 17 435 Off-Street Parking and Loading 17 445 Signs 17 450 View Blockage Requirements 17 455 Interpretations and Exceptions 17 460 Nonconforming Uses and Structures 17 470 Wireless Communication Facilities 17 500 Variances
- Chapter 17. 100 GENERAL PROVISIONS - dcd. kitsapgov. com
The Zoning Ordinance classifies, designates, and regulates the development of land for agriculture, forest, mineral resource extraction, residential, commercial, industrial, and public land uses for the unincorporated area of Kitsap County
- Design Standards and Requirements - dcd. kitsapgov. com
2020 Kitsap County Stormwater Design ManualChapter 1 — Plans and Reports Chapter 2 — Construction Stormwater Pollution Prevention Chapter 3 — Source Control of Pollution Chapter 4 — Conveyance System Analysis and Design Chapter 5 — Stormwater Management BMPs Chapter 6 — Wetlands Protection Chapter 7 — Operation and Maintenance Chapter 8 — Critical Drainage Areas Chapter 9
- Chapter 10. 24 WEAPONS - dcd. kitsapgov. com
The application shall be submitted to the Kitsap County department of community development (DCD) An application for a range shall indicate whether the firearms to be used at the range are of the rim fire, elevated shot or other type or variety and whether the proposed range is to be a private or public range
- Chapter 11. 36 PERMITS AND STANDARDS FOR USE AND IMPROVEMENTS TO COUNTY . . .
Prior to construction of the trail, Kitsap County will provide survey centerline markings to ensure proper placement of the trail improvements near or on the edge of the right-of-way
|
|
|