- 2024 SPP RESOURCE ADEQUACY REPORT
The purpose of this report is to provide the status of each LRE’s compliance with the RAR as well as an SPP BA Area outlook for the 2024–2029 Summer Seasons
- The Future of Resource Adequacy
Methods used to assess resource adequacy and how each technology contributes to it need to evolve and are continually improving
- Report - nerc. com
In the 2024 LTRA, NERC finds that most of the North American BPS faces mounting resource adequacy challenges over the next 10 years as surging demand growth continues and thermal generators announce plans for retirement
- Resource Adequacy (RA) and Electric Reliability in Kansas
Every June, SPP publishes a Resource Adequacy (RA) report detailing the anticipated levels of generation capable of meeting demand in the SPP region for the upcoming Summer
- SPP-resource-adequacy-policy-targets - Oklahoma. gov
LRE Peak Demand Assessment: Envisioned to create incentives to meet the forecasted load Recommended to be considered in conjunction with demand response policy
- SPP 2024 LOSS OF LOAD EXPECTATION STUDY REPORT
The results provided insight to SPP staff, stakeholders, and other applicable governing bodies when making resource adequacy policy decisions and establishing a PRM3
- 2024 Summer Reliability Assessment
NERC’s annual SRA covers the upcoming four-month (June–September) summer period This assessment evaluates generation resource and transmission system adequacy as well as energy sufficiency to meet projected summer peak demands and operating reserves
- New DOE Report Outlines Solutions to Meet Increasing Electricity Demand . . .
Read full report here: The U S Department of Energy’s 2024 Future of Resource Adequacy Report outlines a wide array of solutions to address increased electricity demand on the nation’s power grid while continuing to reduce emissions
|
|
|