- Home - Thompson Metal Fab
With over 50 years of modular fabrication experience, we deliver turnkey assemblies that reduce field work, shorten schedules, and mitigate risk We collaborate closely with mechanical, electrical, hydraulic, and transport partners to build efficiently, indoors and out
- Company - Thompson Metal Fab
Founded in 1937, Thompson Metal Fab has built a lasting legacy of precision, innovation, and craftsmanship What began as a small shop has grown into a world-class fabrication company delivering steel structures that stand the test of time
- Capabilities - Thompson Metal Fab
With expansive indoor and outdoor fabrication areas and direct access to the Columbia River, we offer flexible shipping and logistics options by barge, truck, or rail Every element of our setup is designed for safety, productivity, and the seamless execution of large-scale projects
- Sellwood Bridge - Thompson Metal Fab - tmfab. com
The finished bridge reflects not only the scale and complexity of the fabrication effort but also TMF’s ability to execute technically demanding, high-profile infrastructure projects under rigorous specifications
- Contact - Thompson Metal Fab
P O Box 5276 Vancouver, Washington 98668 Visit Us 3000 S E Hidden Way (Building 40)u2028Vancouver, Washington 98661 ©2025 Thompson Metal Fab All Rights Reserved Website by Blue Blazes
- Hayward Field - Thompson Metal Fab
When the University of Oregon redeveloped its iconic Hayward Field, Thompson Metal Fab was brought on to fabricate major structural elements for the stadium’s sweeping architectural design
- The Dalles US197 Bridge Retrofit - Thompson Metal Fab
Thompson Metal Fab was selected to support the $41 million retrofit of the US197 Bridge at The Dalles, a key crossing originally constructed in 1953 The project focused on replacing the bridge deck while preserving the existing structure
- AGP Shiploader Repairs - Thompson Metal Fab
Following a major mechanical failure, Thompson Metal Fab provided fabrication and design-assist services to help restore AG Processing’s shiploader—delivering a 75,000 lb replacement boom in just two months
|